No Products in the Cart
Caterpillar 318-6357 is a fuel transfer pump for the Caterpillar C7 and C9 engines (324D, 325D, 330C, 336D excavators). This aftermarket version is made to the same mounting and connections as the original, so it fits where the old one came off.
Sold as one unit. Check the number on your old part, or in the parts manual for your machine, before ordering.
| Part Type | Fuel Transfer Pump |
| Replaces | Caterpillar 318-6357 |
| Fits | Caterpillar C7 and C9 engines (324D, 325D, 330C, 336D excavators) |
| Condition | New, aftermarket |
| Stat. HS-Code | 841330 |
Caterpillar machines
Check the part number on your old unit before ordering.
| Caterpillar Part No.(SPM Part No.) | Fits |
|---|---|
| 318-6357(SPM-HEP-2554) | Caterpillar C7 and C9 engines (324D, 325D, 330C, 336D excavators) |
Hard starting
A weak lift pump starves the injection pump. Long cranking after standing is a common sign.
Loss of power under load
If the engine pulls well when light but dies off under load, check fuel delivery and the lift pump.
Leaks
Fuel weeping from the pump body or seals means it is time to replace it.
Bleeding the system
Prime and bleed the fuel system after fitting the new pump.
We check what other aftermarket sellers charge for this same part. Their prices on the date we checked:
| Seller | Price | Checked |
|---|---|---|
| eBay (3 aftermarket sellers) | USD 119.99 to 135.46 | 5 Oct 2026 |
| Spare Part Mart | USD 95.99 | Today |
Our price of USD 95.99 is 20% to 29% less than these sellers.
Found this part cheaper somewhere else? Send us the listing and we will beat it by 5% under our Price Beat Guarantee. Every order is also covered by our 30 day money back guarantee.
No. It is an aftermarket part made to fit in place of Caterpillar 318-6357. It is not made by or affiliated with Caterpillar; the Caterpillar part number is used only to show what it replaces.
It fits Caterpillar C7 and C9 engines (324D, 325D, 330C, 336D excavators). Machines change parts between serial number ranges, so check the number on your old part or in your parts manual.
It is made to the same mounting and connections as the original part. Fit new gaskets and seals where they are used, and check for leaks and correct operation before putting the machine back to work.
Yes, we ship worldwide. Shipping is calculated at checkout, and every order is covered by our 30 day money back guarantee and price beat guarantee.
Orders typically require 1 to 5 business days for processing. During this time, we confirm product availability and prepare the shipment for consolidation.
We offer two shipping tiers. The exact cost and transit time for every option are quoted live at checkout, and you can also check them from the cart page before you buy.
Express (DHL, UPS, EMS)
For urgent needs. Transit is typically 3 to 8 business days after dispatch, depending on destination.
Economy (air cargo and special lines)
Our standard, cost-effective option. Transit is typically 5 to 15 business days after dispatch.
Shipping costs are calculated at checkout based on your location and selected shipping method.
Once your order ships, you'll receive a tracking number via email so you can monitor your delivery.
For detailed delivery information and FAQs, please visit our Delivery Information page or contact us.
Prices depend on your postcode.
In USD for the quantity selected. The exact cost is confirmed at checkout.


