Sie haben keine Artikel im Warenkorb.
Becker 90133400004 (WN 124-031) is a set of 4 graphite carbon vanes, each 240 x 48 x 4 mm (length x height x thickness), for Becker KDT 2.140, KDT 3.140, KVT 2.140, KVT 3.140, KL 1.140 large dry running (oil free) rotary vane pumps and pressure / vacuum combination units. This aftermarket set is made to the same size as the original.
In a dry running Becker pump the carbon vanes are the main wear part. They slide in the rotor slots, are thrown out against the cylinder wall and wear a little on every turn. As they shorten the pump loses vacuum and flow, runs hotter and gets noisier, and a vane worn too far can break and damage the cylinder. Becker sets a minimum vane height in each pump's manual; change the full set before the vanes reach it.
Always change all 4 vanes together so the rotor stays balanced, and clean the carbon dust out of the pump and filters while it is open. The vanes are made from self lubricating graphite carbon to the Becker size and come as a complete set for one pump.
Check the set size before ordering: the same 240 x 48 x 4 mm vane is also sold as Becker 90133400007, a set of 7 for the DVT 2.140, DVT 3.140.
| Part Type | Carbon vane set (rotary vanes) |
| Replaces | Becker 90133400004 (WN 124-031) |
| Vanes in Set | 4 |
| Vane Size (L x H x T) | 240 x 48 x 4 mm |
| Material | Self lubricating graphite carbon |
| Fits | Becker KDT 2.140, KDT 3.140, KVT 2.140, KVT 3.140, KL 1.140 |
| Pump Type | Dry running rotary vane vacuum pump / compressor |
| Stat. HS-Code | 841490 |
Becker pumps
Check the pump model plate and measure an old vane: 240 x 48 x 4 mm.
| Pack | Dimensions | Becker Part No.(SPM Part No.) | Fits |
|---|---|---|---|
| Set of 4 | 240 x 48 x 4 mm | 90133400004 / WN 124-031(SPM-VAN-2205) | Becker KDT 2.140, Becker KDT 3.140, Becker KVT 2.140, Becker KVT 3.140, Becker KL 1.140 |
Planned vane changes
Measure the vane height at every service and change the set before it reaches Becker's minimum for your pump. Keeping a spare set means the change happens at the service, not after a breakdown.
Falling vacuum or flow
If the pump takes longer to pull down, holds a weaker vacuum or a vacuum table starts letting parts slip, worn vanes are the usual cause once the filters are clean.
Noisy or hot running
Short or chipped vanes chatter in the slots and the pump runs hotter. Stop and check the vanes before one breaks.
Typical machines
Becker dry running vane pumps run CNC router vacuum tables, printing and paper handling machines, packaging and pick and place equipment, woodworking clamps and pneumatic conveying.
We check what other aftermarket sellers charge for this same part. Their prices on the date we checked:
| Seller | Price | Checked |
|---|---|---|
| eBay (2 aftermarket sellers) | USD 73.99 to 90.00 | 6 Oct 2026 |
| Best Vane | USD 149.00 | 6 Oct 2026 |
| Fluid-X | USD 257.40 | 6 Oct 2026 |
| REM Equipment (SuperVane) | USD 295.18 | 6 Oct 2026 |
| Spare Part Mart | USD 53.44 | Today |
Our price of USD 53.44 is 28% to 82% less than these sellers.
Found this part cheaper somewhere else? Send us the listing and we will beat it by 5% under our Price Beat Guarantee. Every order is also covered by our 30 day money back guarantee.
No. It is an aftermarket set made to the size of the Becker 90133400004 vanes. It is not made by or affiliated with Becker; the Becker numbers are used only to show what it replaces.
Yes if your pump is a Becker KDT 2.140, KDT 3.140, KVT 2.140, KVT 3.140, KL 1.140 and the old vanes measure 240 x 48 x 4 mm. Check the model plate on the pump and measure an old vane before ordering.
The KDT 2.140, KDT 3.140, KVT 2.140, KVT 3.140, KL 1.140 rotor has 4 slots. Change every vane at the same time; mixing new and worn vanes unbalances the rotor and wears the new vanes fast.
When the vanes are worn down to the minimum height in your pump's manual, or sooner if a vane is chipped or cracked. Measure them at every filter service.
Clean the carbon dust from the pump housing, rotor slots and filters, and change the inlet and outlet filters if they are loaded. Fit the vanes the same way round as the old ones, with the bevelled edge against the cylinder wall.
Yes, we ship worldwide. Shipping is calculated at checkout, and every order is covered by our 30 day money back guarantee and price beat guarantee.
Bestellungen benötigen in der Regel 1 bis 5 Werktage für die Bearbeitung. Während dieser Zeit bestätigen wir die Verfügbarkeit der Produkte und bereiten die Sendung für die Konsolidierung vor.
Wir bieten zwei Versandstufen an. Die genauen Kosten und die Laufzeit für jede Option werden an der Kasse live angezeigt; Sie können diese auch auf der Warenkorbseite einsehen, bevor Sie Ihren Kauf abschließen.
Express (DHL, UPS, EMS)
Für dringende Bedürfnisse. Die Laufzeit beträgt nach dem Versand in der Regel 3 bis 8 Werktage, abhängig vom Zielort.
Economy (Luftfracht und spezielle Linien)
Unsere kostengünstige Standardoption. Die Laufzeit beträgt nach dem Versand in der Regel 5 bis 15 Werktage.
Die Versandkosten werden an der Kasse basierend auf Ihrem Standort und der gewählten Versandmethode berechnet.
Sobald Ihre Bestellung versandt wurde, erhalten Sie per E-Mail eine Sendungsverfolgungsnummer, mit der Sie Ihre Lieferung verfolgen können.
Für detaillierte Lieferinformationen und häufig gestellte Fragen besuchen Sie bitte unsere Seite mit Lieferinformationen oder kontaktieren Sie uns.
Prices depend on your postcode.
In USD for the quantity selected. The exact cost is confirmed at checkout.


